Solar panel grants in Cyprus: €450 to €1,000 per kW

Read Time: 20 minute(s)
Solar panel grants in Cyprus

Solar panel grants in Cyprus: what the new scheme pays

Solar panel grants in Cyprus reopen on 20 October 2026 after nine months with nothing available. The budget is €20 million, it is first come first served, and the paperwork you need takes weeks to prepare.

Solar grant scheme in Cyprus are paid through the Εξοικονομώ – Αναβαθμίζω στις Κατοικίες scheme, which the Ministry of Energy, Commerce and Industry runs. Its third call was published on 30 September 2026 and it is the first scheme since the end of 2025 to pay anything towards home solar.

Applications open

Tue 20 October 2026

From 09:00, online only

Applications close

Wed 30 December 2026

At 23:59, or earlier if the €20m runs out

Read this before you plan anything

These are not grants for solar panels on their own. The scheme funds a whole-home energy upgrade, and solar is one part of it. To receive anything you must also insulate part of the house and cut its energy use by at least 60%. An application for panels and a battery alone will be rejected.

How much the solar panel grants pay

Grants are fixed amounts per kW and per kWh, not a percentage of your invoice. There are two rates, and the increased one more than doubles what you get for panels.

Solar panel and battery grant rates

What you install Standard Increased
Solar panelsMaximum 10 kW, connected to your electricity account €450 per kW €1,000 per kW
Battery storageMaximum 4 kWh, storing energy from the panels €720 per kWh €960 per kWh
At the maximum sizes10 kW of panels plus 4 kWh of storage €7,380 €13,840

The scheme also pays for the building work you have to do to qualify.

The other work the scheme funds You need at least one of the first three to qualify at all.

Work Standard Increased
Roof and floor insulation€30 per m²€40 per m²
Wall insulation€40 per m²€55 per m²
New windows and doors€200 per m²€265 per m²
External shading€135 per m²€180 per m²
Solar water heater€885€1,180
Air conditioning, up to 4 kW€290 per unit€390 per unit
Air conditioning, over 4 kW€525 per unit€700 per unit
Heat pump€3,225€4,300
Energy assessor's fee€3.75 per m²€5 per m²

 

Which homes qualify for solar panel grants in Cyprus

Four rules do most of the filtering.

The house must pre-date 2008

It must have been connected to the electricity grid before 1 January 2008, or have had its planning or building permit application submitted before 21 December 2007. Newer houses are not eligible at all.

You must insulate, not only add panels

Every application needs at least one of: roof and floor insulation, wall insulation, or new windows and doors.

The house must use 60% less primary energy

Measured by an energy performance certificate before and after. This is why the scheme funds insulation, heating and solar together rather than any one of them.

Net metering systems are excluded

The guide is explicit that photovoltaic systems operating under net metering are not eligible investments. Since net metering closed to new connections at the end of 2025, this mainly affects anyone hoping to extend an older system.

Also required. The house must not belong to a company, must not be rented to a company, and must not be used for business for five years after the grant is paid. A house rented by one individual to another is fine if it is a long-term let for permanent residence. You may submit one application, for one house. You cannot claim for work already funded by an earlier call or another scheme.

Who gets the increased rate

The increased rate takes the solar grant from €450 to €1,000 per kW. On a 10 kW system that is the difference between €4,500 and €10,000. Four groups qualify.

  • Vulnerable consumers. The guide lists 22 categories. They include people receiving Minimum Guaranteed Income or Public Assistance, low-income pensioners, single-parent families, families with three or more children on child benefit, families with children under 18 and gross household income up to €19,500, and recipients of several disability and specific medical allowances. The application can be made by the person themselves or by a spouse, parent, child, sibling, grandparent, grandchild or legal guardian, and it must be the vulnerable person’s permanent home.
  • Houses in mountain areas. Decided purely by postcode. Check yours below.
  • Houses in refugee settlements. Where it is the applicant’s permanent home and the applicant or their spouse is a displaced person.
  • Apartment buildings upgrading together. Where the management committee applies for the whole building and at least five residential units are upgraded.

Check if your postcode is a mountain area

The ministry decides this strictly by postcode, taken from the address on your electricity bill. If your postcode is not on the list, the house does not count as a mountain area however high up it is.

All 191 mountain communities from Appendix C of the scheme guide.

Type a four-digit postcode to check it.

Show the full list of 191 mountain postcodes
PostcodeCommunityDistrict
7711Agioi VavatsiniasLarnaka
7714Kato DrysLarnaka
7716MeliniLarnaka
7718OdouLarnaka
7719OraLarnaka
7712VavatsiniaLarnaka
2820Agia Eirini LefkosiasLefkosia
2772Agia Marina XyliatouLefkosia
2610Agios Epifanios OreinisLefkosia
2821Agios Epifanios SoleasLefkosia
2773Agios Georgios KafkallouLefkosia
2825Agios Nikolaos StegisLefkosia
2823Agios Theodoros SoleasLefkosia
2951Agios Theodoros TilliriasLefkosia
2953AlevgaLefkosia
2750AlithinouLefkosia
2751AlonaLefkosia
2613AplikiLefkosia
2752AskasLefkosia
2828Dasikos Stathmos KapourasLefkosia
2829Dasikos Stathmos PlatanionLefkosia
2831EvrychouLefkosia
2620FarmakasLefkosia
2623FikardouLefkosia
2758FterikoudiLefkosia
2827GalataLefkosia
2861GerakiesLefkosia
2615GourriLefkosia
2800KakopetriaLefkosia
2832KalianaLefkosia
2616Kalo Chorio OreinisLefkosia
2862KalopanagiotisLefkosia
2619KampiLefkosia
2863KamposLefkosia
2834KannaviaLefkosia
2645KapedesLefkosia
2843Kato FlasouLefkosia
2770Kato KoutrafasLefkosia
2940Kato PyrgosLefkosia
2835KatydataLefkosia
2955KokkinaLefkosia
2836KorakouLefkosia
2846KourdaliLefkosia
2753LagouderaLefkosia
2618LazaniasLefkosia
2845LinouLefkosia
2754Livadia LefkosiasLefkosia
2958MansouraLefkosia
2865Moni KykkouLefkosia
2621Moni MachairaLefkosia
2959MosfiliLefkosia
2866MoutoullasLefkosia
2864MylikouriLefkosia
2777NikitariLefkosia
2867OikosLefkosia
2961PachyammosLefkosia
2740Palaichori MorfouLefkosia
2745Palaichori OreinisLefkosia
2844Pano FlasouLefkosia
2771Pano KoutrafasLefkosia
2950Pano PyrgosLefkosia
2850PedoulasLefkosia
2962PigeniaLefkosia
2755PlatanistasaLefkosia
2756PolystyposLefkosia
2780PotamiLefkosia
2757SarantiLefkosia
2964Selladi tou AppiLefkosia
2839SinaorosLefkosia
2840SkouriotissaLefkosia
2841SpiliaLefkosia
2868Stathmos OrgontaLefkosia
2842TemvriaLefkosia
2869TsakistraLefkosia
2774VyzakiaLefkosia
2781XyliatosLefkosia
4710Agios Amvrosios LemesouLemesos
4842Agios DimitriosLemesos
4740Agios Georgios LemesouLemesos
4871Agios Ioannis LemesouLemesos
4561Agios KonstantinosLemesos
4741Agios MamasLemesos
4562Agios PavlosLemesos
4870Agios Theodoros LemesouLemesos
4711Agios TheraponLemesos
4872AgridiaLemesos
4860AgrosLemesos
4501AkapnouLemesos
4712AlassaLemesos
4541ApesiaLemesos
4542ApsiouLemesos
4563ArakapasLemesos
4770Arsos LemesouLemesos
4875ChandriaLemesos
4841Dasiko Kolegio KyprouLemesos
4564DieronaLemesos
4774DoraLemesos
4750DorosLemesos
4873DymesLemesos
4506EptagoniaLemesos
4814FoiniLemesos
4543GerasaLemesos
4773GerovasaLemesos
4566Kalo Chorio LemesouLemesos
4843KaminariaLemesos
4544KapileioLemesos
4810Kato AmiantosLemesos
4714Kato KividesLemesos
4874Kato MylosLemesos
4815Kato PlatresLemesos
4500KellakiLemesos
4775KissousaLemesos
4507KlonariLemesos
4776KoilaniLemesos
4545KorfiLemesos
4743KoukaLemesos
4876KyperountaLemesos
4744LaneiaLemesos
4844LemithouLemesos
4546LimnatisLemesos
4716LofouLemesos
4560LouvarasLemesos
4777MaliaLemesos
4778Mandria LemesouLemesos
4746MonagriLemesos
4847Moni Panagias TrikoukkiotissisLemesos
4812Moni TrooditissisLemesos
4747MoniatisLemesos
4552Monte KorfiLemesos
4760OmodosLemesos
4700PachnaLemesos
4845PalaiomylosLemesos
4811Pano AmiantosLemesos
4715Pano KividesLemesos
4820Pano PlatresLemesos
4878PelendriLemesos
4779Pera PediLemesos
4780PotamiouLemesos
4879PotamitissaLemesos
4505Prastio KellakiouLemesos
4840ProdromosLemesos
4748SaittasLemesos
4877Sanatorio KyperountasLemesos
4510SanidaLemesos
4848Scholi MitsiLemesos
4742SilikouLemesos
4749Stathmos FilagronLemesos
4751Stathmos LaneiasLemesos
4813Stathmos MozoraLemesos
4568Stathmos PefkouLemesos
4569SykopetraLemesos
4846Treis EliesLemesos
4730TrimikliniLemesos
4800TroodosLemesos
4771Vasa KoilaniouLemesos
4509ViklaLemesos
4772VouniLemesos
4565ZoopigiLemesos
8641Agia Marina KelokedaronPaphos
8741Agios DimitrianosPaphos
8621Agios Ioannis PaphouPaphos
8623Agios Nikolaos PaphouPaphos
8802AnadhiouPaphos
8625ArminouPaphos
8643AsprogiaPaphos
8742DrymouPaphos
8629Filousa KelokedaronPaphos
8748FitiPaphos
8645GalatariaPaphos
8746Kannaviou - MelamiouPaphos
8626KedaresPaphos
8628KelokedaraPaphos
8627KidasiPaphos
8646KoiliniaPaphos
8747Kritou MarottouPaphos
8647LapithiouPaphos
8740LasaPaphos
8878Livadi PaphouPaphos
8648MamountaliPaphos
8631MesanaPaphos
8744Milia PaphouPaphos
8640Pano PanayiaPaphos
8650PentaliaPaphos
8870PomosPaphos
8630PretoriPaphos
8749PsathiPaphos
8620SalamiouPaphos
8651Statos-Agios FotiosPaphos
8743ThriniaPaphos
8608TrachypedoulaPaphos
8644VretsiaPaphos

Confirm your own postcode against the ministry’s document before relying on it.

Solar grant scheme 2026

 

What to do before 20 October

The money is fixed at €20 million and applications are handled in the order they arrive. The slow part is not the building work, it is the paperwork, and one piece of it has to exist before you can apply at all.

  1. Check the connection date
    Find an electricity bill and confirm the house was connected before 2008, or that the building permit was applied for before 21 December 2007. If neither is true, nothing else matters.
  2. Appoint a qualified energy assessor
    An Ειδικευμένος Εμπειρογνώμονας, from the Energy Service’s register of Specialised Experts. They issue the certificate and model what the upgrade will achieve. They cannot be a relative of yours within the fourth degree.
  3. Get the initial energy certificate issued
    It must be dated after 15 May 2026. An older certificate does not count.
  4. Agree the package
    Insulation plus solar plus whatever else reaches 60%. Your assessor models it, your installer prices it.
  5. Check your installer is on the register
    The scheme requires the solar system to be installed by a company listed on the Energy Service’s register of solar photovoltaic installers. A solar water heater has to come from the solar thermal register. Work by an unregistered installer is not funded.
  6. Gather the documents
    The full list is below. Title deeds in particular can take time if the deed is not yet in your name.
  7. Apply from 20 October
    Online only, through the ministry’s grant system at fundingapps.meci.gov.cy. Nothing is accepted on paper or by email.

Do not start work before the energy certificate is issued. Only work carried out after 15 May 2026 and after your initial certificate counts. You also must not have finished everything before you submit. Once approved you have twelve months to complete the job.

The energy certificate

An energy performance certificate, or ΠΕΑ, rates a building from A to H and can be issued only by an Ειδικευμένος Εμπειρογνώμονας — a Qualified Expert registered with the Energy Service. You need two of them: one before the work, which sets the baseline, and one after, which proves the 60% reduction. The grant is worked out from the difference.

An old certificate will not count

Certificates last ten years and one is issued on every sale and letting, so your house may well have one already. The scheme accepts only an initial certificate dated after 15 May 2026. Nothing else in the application can move until it exists, so this is the first call to make.

Before you hire an assessor, check the public register — the ministry publishes it as open data you can download in full — and confirm the registration is current and covers your category of building. They also cannot be related to you within the fourth degree.

The fee is a funded cost, at €3.75 per m² on the standard rate and €5 per m² on the increased rate, so €562.50 or €750 on a 150 m² house. You pay the assessor and claim it back with the rest of the work.

What you need to apply

Every applicant submits these:

  • Your latest electricity bill. If supply has been disconnected, EAC can issue a certificate instead showing the original connection date and consumption history.
  • Proof the house was connected before 1 January 2008. A certificate from your electricity supplier, or a copy of the building or planning permit, or official proof the permit application went in before 21 December 2007.
  • The title deed for the house or the plot. It cannot be in a company’s name. If you are not the owner, the owner’s written consent goes in as well. Where no deed exists yet, a stamped sale agreement plus the seller’s title and proof of deposit at the Land Registry will do, with extra evidence if the agreement is more than three years old.
  • The initial energy certificate as both PDF and NCT/ECO file, with the assessor’s recommendations and floor plans of every storey showing the zones as recorded.
  • The assessor’s standard declaration.

Three groups submit more. Vulnerable consumers applying through a relative need a community leader’s declaration confirming where the person lives, plus proof of the relationship. Refugee settlement applicants need a refugee identity card, confirmation the house is inside a settlement, and a community leader’s certificate. Apartment buildings need the committee’s minutes, a declaration signed by every owner, all the title deeds, all the electricity bills and written authority for the representative.

After you apply

Applications are assessed in submission order. If yours is approved you sign a public funding agreement and have twelve months to carry out the work. You then submit a payment claim with the final energy certificate and a detailed report from your assessor confirming the saving achieved. The ministry verifies the claim, and may inspect the house, before paying.

If your application is rejected or you are paid less than you claimed, you have 30 calendar days to appeal to the ministry’s appeals committee. After that there are a further 75 days to go to the Administrative Court. You must keep all the paperwork for five years, and keep the funded equipment in place for five years from final payment.

A missing document costs €500

The payment claim has to be complete when you send it. If something is missing, the ministry has to go through your file a second time, and you pay for that second look. You do not lose the grant — as long as the house still meets the criteria, the claim is still paid — but €500 comes off the amount.

So the €500 is what one forgotten document costs. Check the file against the list before you send it.

Your assessor’s record matters as well. Every time a claim goes back for re-examination, the ministry records which assessor signed the paperwork. Once an assessor has appeared on that list more than five times, the ministry stops accepting any certificate, document or declaration they have signed. Ask about this before you hire anyone.

If your application is rejected or you are paid less than you claimed, you have 30 calendar days to appeal to the ministry’s appeals committee. After that there are a further 75 days to go to the Administrative Court. You must keep all the paperwork for five years, and keep the funded equipment in place for five years from final payment.

Is it worth it for the solar alone?

That depends on what the insulation costs you.

If the house needs insulation anyway, the arithmetic is good. A 10 kW system and a 4 kWh battery bring €7,380 at the standard rate, and the insulation and windows are paid at their own rates on top. If the house is already well insulated and you only want panels, this is probably not your route, because panels alone cannot be funded.

One limitation the grant does not solve. A battery capped at 4 kWh is smaller than most Cyprus households need for evening cover. You can fit a larger one and claim on the first 4 kWh, and the rest is your own money.

Find out if your house qualifies

Tell us your postcode and roughly when the house was built. We will tell you whether it qualifies for solar panel grants in Cyprus, what package would reach 60%, and what the grant would come to. No charge, and we will say if it does not qualify.

FAQ’s

Most asked questions
about solar panel grants in Cyprus

Are there solar panel grants in Cyprus right now?

Yes, from 20 October 2026. Solar panel grants in Cyprus are paid under the Εξοικονομώ–Αναβαθμίζω στις Κατοικίες scheme at €450 per kW, or €1,000 per kW for vulnerable households, mountain postcodes, refugee settlement homes and apartment buildings upgrading together. The panels must be part of a wider upgrade that cuts the home’s energy use by at least 60%.

How much is the battery grant in Cyprus?

€720 per kWh at the standard rate and €960 per kWh at the increased rate, on batteries up to 4 kWh that store energy from the solar system. That is €2,880 or €3,840 at the maximum size.

Can I apply for solar panels on their own?
No. Every application must include at least one building envelope measure, meaning roof or floor insulation, wall insulation, or replacement windows and doors, and the house must reach a 60% reduction in primary energy use.
Which houses qualify for solar panel grants in Cyprus?
Houses first connected to the electricity grid before 1 January 2008, or whose planning or building permit application was submitted before 21 December 2007. The house must belong to an individual rather than a company, must be in the areas controlled by the Republic of Cyprus, and must not be used for business for five years after the grant is paid.
How do I know if my village counts as a mountain area?
By postcode only, taken from the address on your electricity bill. The scheme guide lists 191 mountain postcodes and there is a checker further up this page. Altitude and the name of the village make no difference: if the postcode is not on the list, the house does not qualify for the increased rate.
How much can I get in total from solar panel grants in Cyprus?
Up to €24,000 per house for an energy upgrade, or up to €32,000 if the house is taken to near-zero energy standard. Those caps cover everything added together, not the solar alone.
What if the money runs out?
The call closes on 30 December 2026 or when the €20 million is committed, whichever comes first. Applications are handled in the order they are submitted, so earlier is safer.
Can businesses or landlords apply?
Companies cannot. Applications come from individuals only, and houses owned by legal entities are excluded. A house rented by one individual to another is eligible if it is a long-term let for permanent residence, but a house rented to a company or used for business is not.
I already have solar. Can I claim just for a battery?
Not on its own. Every application needs an insulation or window measure and the 60% energy saving, and the battery grant is written as storage for the energy the photovoltaic system produces. If your existing system runs on net metering it is excluded from the scheme entirely. Send us your details and we will tell you where you stand.
Can I use the energy certificate I already have?

Only if it is dated after 15 May 2026. Certificates stay valid for ten years and one is issued whenever a house is sold or rented, so many owners already hold one, but an older certificate is not accepted for this scheme no matter how much of its ten years is left. You will need a new initial certificate from a Qualified Expert registered with the Energy Service.